Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Abdallah, F (2019) Agent-based models for residential energy consumption and intervention simulation, Unpublished PhD Thesis, , Birmingham City University.

Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes, Unpublished PhD Thesis, , Birmingham City University.

Carpenter, W J (2004) Design and construction in architectural education: 1963-2003, Unpublished PhD Thesis, , Birmingham City University.

Esezobor, E L (2016) Sustainability and construction : a study of the transition to sustainable construction practices in Nigeria, Unpublished PhD Thesis, School of Engineering and the Built Environment, Birmingham City University.

Gangatheepan, S (2023) Workplace-based learning: a study in BIM-enabled construction projects, Unpublished PhD Thesis, , Birmingham City University.

Ghadiminia, N (2021) Integration of cybersecurity in BIM-enabled facilities management organisations, Unpublished PhD Thesis, , Birmingham City University.

Mayouf, M A A (2016) Improving the delivery of building performance using building information modelling, Unpublished PhD Thesis, School of the Built Environment, Birmingham City University.

Oluwayemi, O (2021) Retrofitting Sustainable Drainage Systems (SUDS) in public buildings in the UK: a cost benefit analysis model, Unpublished PhD Thesis, , Birmingham City University.

Patlakas, P (2022) Techniques for the utilisation and management of post occupancy evaluation data by non-experts, Unpublished PhD Thesis, , Birmingham City University.

Posillico, J J (2023) Development of an interpersonally grounded construction management curriculum foundation model, Unpublished PhD Thesis, , Birmingham City University.

Robson, A (2017) 'Cost as information' for construction supply chain improvements , Unpublished PhD Thesis, School of the Built Environment, Birmingham City University.

Swarnadhipathi, A K C (2009) Perceptions of business performance in medium-sized construction companies in the English Midlands , Unpublished PhD Thesis, School of Engineering and the Built Environment, Birmingham City University.

  • Type: Thesis
  • Keywords: business performance; construction company; people; processes; project
  • ISBN/ISSN:
  • URL: https://www.open-access.bcu.ac.uk/4897/
  • Abstract:
    There is a gap between the performance of the construction company as a business and the performance of its construction projects. The research addresses this gap through how senior managers construct business performance in medium-sized construction companies which are believed to be working at both company and project levels. Existing research identified determinants of business performance as locality, type of work and size of business, as well as management approach. Therefore this research is limited to the English Midlands to ensure commonality in the working conditions of the construction companies investigated and to understand other factors useful in creating business performance. An interpretive research method was chosen because the construction industry operates substantively through the actions and relationships of individuals. A series of in-depth semi-structured interviews was conducted with senior managers in two stages. An analysis based on the content of the interview transcripts was used to develop the understanding of creation of business performance in a construction company. The findings determined that business performance was a fluid concept in practice which is not handled well by academic theory. Medium-sized construction companies have a nature which operates through non-formal "direct managerial contact" and wider integration through a proactive company-wide drive for business development and business improvement. This means that effectively there is no gap between company and project. The company’s business processes are flexible to address the market and client’s changing requirements. However the project processes are more fixed to enable effective delivery. Thus business performance is created as an amalgamation of knowledge, experience, decisions and relationships that operate differently depending on market and operational context to deliver long-term sustainability to the company.